HYDRO POWER PLANT

iEngineering assists the clients for planning & designing of hydro Power Projects at various stages by providing following services

  • Identification of potential hydro project sites.
  • Detailed Hydro logical studies.
  • Detailed topographical survey and field investigations of project site.
  • Pre-feasibility studies and preparation of reports.
  • Detailed Project Reports (Feasibility Study Reports)
  • Project Estimation & Appraisal Reports.
  • Structural designs of all civil components & preparation of construction drawings.
  • Structural designs of all Hydro mechanical components & preparation of fabrication drawings.
  • Supervision of construction & erection work till commissioning of project.
  • Monitoring of construction work at various stages.

IDENTIFICATION OF POTENTIAL HYDRO POWER PROJECT SITES AND PREPARATION OF PRE-FEASIBILITY REPORTS / FEASIBILITY REPORTS / DETAILED ENGINEERING OF HYDRO PROJECTS

The Stages of work from identification of site to commissioning of project will be as below.

  1. Pre-Feasibility Report
  2. Feasibility Report (Detailed Project Report)
  3. Detailed Engineering
  4. Supervision during construction:

1. Preparation of Pre-Feasibility Report

Scope of Work

  1. Reconnaissance survey of project site
  2. Identification of ideal locations for project components
  3. Preparation of Preliminary layout of scheme
  4. Assessment of head
  5. Assessment of discharge
  6. Assessment of power potential
  7. Preliminary working of annual energy generation
  8. Preliminary costing of the project
  9. Preliminary assessment of Financial parameters
  10. Salient Features of project site
  11. Preparation of Pre-Feasibility report    

2. Preparation of Feasibility Report (Detailed Project Report)

Scope of Work

  1. Detailed topographical survey of project site including alternative proposals with contour interval of one meter
  2. Transmission line survey
  3. Approach road survey
  4. Topographical Survey Report
  5. Processing of hydro logical data for discharge assessment
  6. Preparation of Project layout with alternative proposals
  7. Preparation of conceptual drawings of project components
  8. Determination of net head
  9. Determination of power potential
  10. Determination of Installed capacity
  11. Assessment of annual energy generation
  12. Selection of suitable turbine
  13. Preparation of cost Estimates
  14. Financial viability of project (IRR, DSCR, Payback Period, cost of energy generation, B/C ratio etc)
  15. Sensitivity analysis
  16. Salient Features of project
  17. Preparation of Feasibility report (Detailed Project Report)